The proposed development comprises a new rail freight facility on the Chiltern Main Line near Ardley, Oxfordshire. The facility would involve a new rail terminal and its associated infrastructure, which would include warehousing for logistics (up to 6.5m sq ft), management building, rail reception sidings, container storage area and associated container transfer equipment, and refuelling facility. The proposed development would also include the following highway works:
The site extends to c. 600 acres and is strategically located along the M40 corridor mid-way between London and Birmingham. The proposals are landscape-led to ensure the development assimilates into its surroundings.
The DCO is expected to be submitted to the Planning Inspectorate in 2023.